SEVENWAYS STREETSCAPE WORKS & UPGRADE WORKS
​
Client: Local Council
Scope:
Hibernian Contracting were engaged by Council for the construction of Seven Ways Streetscape project. The awesome streetscape and park works revitalised the area.
The project incorporates the following civil and landscaping works, including but not limited to:
-
Installation of site fencing.
-
Installation and maintenance of erosion and sedimentation control devices.
-
Clearing, stripping and grubbing.
-
Demolition and salvage works.
-
Earthworks and regrading.
-
Construction of subsoil drainage, stormwater pits and pipes.
-
Construction of pavements including concrete and gravel.
-
Construction of kerbing and drainage.
-
Construction of walls, including concrete walls, precast coping, tiling and timber tops.
-
Construction of services including electrical, potable water and stormwater.
-
Supply and installation of furniture items including seats, bubblers, bins.
-
Supply and installation of mulching, planting and grass seeding.
-
Spreading of imported and site mulch.
Click on the camera to view some cool footage
ROWLAND PARK PLAYGROUND
Client: Local Council
Scope:
The newly constructed playground is in Rowland Park, Daceyville. The park is surrounded by Banks Avenue to the west, Birdwood Avenue and Prince Edward Circuit to the south and Bunnerong Road to the East.
The excellently executed works consist of:
-
A new playground with senior, junior and nature play areas to replace an existing playground. It consists of new play equipment, hardscapes, shade sails, planting, seats, picnic tables, BBQ and picnic shelters.
-
A new senior play area with a hardstand area, seating and ping pong table.
-
A new senior play area with a half basketball court and seating
The Scope of Work included:
-
Demolition, clearing and removal
-
Site grading and excavation
-
Fine grading
-
Drainage
-
Hardscapes
-
Sandstone walls
-
Concrete paving
-
Stepping stones
-
Rock placement
-
Site furniture
-
Installation of play equipment & play surfacing
-
Imported soil
-
Preparation planting beds
-
Soil improvements
-
Planting
-
Planting & turfing
-
Irrigation
-
Maintenance
​
Click on the camera to view some cool footage
THOMAS HOGAN RESERVE, BONDI
Client: Local Council
Scope:
The newly constructed playground & park is in Thomas Hogan Reserve, Bondi.
The work as covered in this project included the ordering, supply and coordination of delivery
of all materials and the cost of all labour, equipment, machinery, all applications, testing, certificates and making good, as necessary.
Scope of Work included:
-
Tree Protection & Tree Work
-
Demolition
-
Earthworks
-
Site topsoil tests
-
Topsoil Ameliorants
-
Sub-base Cultivation
-
Stonework, Sandstone Retaining Walls
-
Pavers
-
Concrete Finishes
-
Wet Pour Rubber, Supply & Installation, Certification
-
Furniture
-
Playground Equipment Supply & Installation
-
Playground Equipment Supply & Installation and certification.
-
Planting, Mulching, Turfing & Maintenance
-
Traffic & Pedestrian Management
-
Site Remediation
​
​
ERIC PREMROSE RESERVE, RYDALMERE
Client: Local Council
Scope:
The newly constructed playground & park is in Eric Primrose Reserve, Rydalmere.
The project included the following significant features:
-
Construction of new concrete pathways and reinforced concrete picnic shelter slabs
-
Supply and installation of new shelters, BBQ’s and street furniture.
-
New shade structures.
-
Planting of advanced plants.
-
Associated earthworks and landscaping.
-
Maintenance of turf and planting.
Scope of Work included:
-
Tree Protection & Tree Work
-
Demolition
-
Earthworks / Remediation
-
Site topsoil tests
-
Topsoil Ameliorants
-
Sub-base Cultivation
-
Stonework, Sandstone Retaining Walls
-
Pavers
-
Concrete Finishes
-
Wet Pour Rubber, Supply & Installation, Certification
-
Furniture
-
Playground Equipment Supply & Installation and certification.
-
Planting, Mulching, Turfing & Maintenance
-
Traffic & Pedestrian Management
-
Site Remediation
​
ROSELLA PARK, HARRIS PARK
Client: Local Council
Scope:
The newly constructed playground & park is located at: Les Burnett Lane, Harris Park, Parramatta
The works include the following significant features:
-
A new carpark, including kerb and gutter and road pavement
-
Installation of two new picnic shelters
-
A new BBQ unit
-
The installation of new seats, picnic table and bins
-
Concrete paths
-
Relocated park lighting
-
Construction of a new Public Toilet amenity building
-
Landscaping & Maintenance
​
ENHANCEMENTS TO LANDSCAPING AND PICNIC FACILITIES AT RYDALMERE FORESHORE
Client: Local Council
Scope:
The works include the following significant features:
-
Construction of new concrete pathways and reinforced concrete picnic shelter slabs.
-
Supply and installation of new shelters, BBQ’s and street furniture.
-
Repair and upgrade existing shade structures as detailed in the plans.
-
Planting of advanced plants.
-
Associated earthworks and landscaping.
-
Undertake 26 Week Maintenance period.
ROWLAND PARK AMENITIES & CANTEEN
​
Client: Local Council
Local Council engaged Hibernian Contracting Pty. Ltd. for the demolition of the existing building and the construction of a new amenity building and kitchen.
The scope of works included the following:
-
Demolish of existing building
-
Construction of a new amenities building
-
Construction of a canteen building
-
Construct the elevated garden structure over the amenity’s buildings
-
Formwork, Concrete & Reinforcement
-
Waterproofing
-
Unisex toilets
-
Accessible toilet with baby change
-
Operational lunchroom
-
Operational storage
-
Club Storage
-
External hand wash and bubbler
-
External covered area
-
Canteen
-
Metal Roofing
-
Rendering
-
Precast
-
Tiling
-
Painting
-
Landscaping
-
Stormwater Drainage
CAHILL PARK CAFÉ BUILDING & ADJACENT AMENITY BUILDING
Client: Local Council
​
Hibernian Contracting were engaged by council to undertake the construction of the Cahill Park Café and Amenity Building. Cahill Park is owned and managed by local council and is located at 2 Princes Highway, Wolli Creek.
The scope of works included:
-
Excavation
-
Piling
-
Café & Kitchen construction
-
Curved Formwork, Concrete, Reinforcement
-
Construction of Servery/Front Counter/Cashier inclusive of POS facilities
-
Bin Storage
-
Delivery Area
-
Storage Area inclusive of refrigerated storage
-
External seating area for café patrons
-
Public Toilets
-
Accessible toilets
-
Unisex baby change facility
-
Toilets to have service corridor
-
Stormwater Retention and reuse
-
Waterproofing
-
Landscaping
-
Metal Roofing
-
Rendering
-
Waterproofing
-
Tiling
-
Painting
-
Curved Windows & Doors
​
WAVERLEY CEMETERY HERITAGE BUILDING WORKS
Client: Local Council
​
Hibernian Contracting were engaged by council to undertake the construction & heritage works to the following buildings at Waverley Cemetery, Bronte:
-
Waverley Cemetery Office Building
-
Waverley Cemetery Caretaker’s Residence
-
Waverley Council Garage
-
Waverley Cemetery maintenance building
-
Waverley Cemetery Toilet Block
The scope of works included:
-
Crack Repair
-
Mosaic Tile Repair
-
Slab demolition and reinstatement to AS Standards
-
Roof Repair: Consisting of new timber structure, slating, water proofing
-
Underpinning of buildings
-
Copper Gutters and downpipes
-
Fascia & Soffit Repair
-
Sandstone Repair
-
Asphalting
-
Excavation
-
Rendering
-
Geotechnical testing and reporting
BALD ROCK HOTEL, ROZELLE – BUILDING & HERITAGE WORKS
Client: Private Owner
​
Hibernian Contracting were engaged by the proprietor to undertake the construction & heritage works to the Bald Rock Hotel, Rozelle:
The scope of works included:
-
Crack Repair
-
Mosaic Tile Repair
-
Slab demolition and reinstatement to AS Standards
-
Roof Repair: Consisting of new timber structure, slating, water proofing
-
Underpinning of buildings
-
Copper Gutters and downpipes
-
Fascia & Soffit Repair
-
Sandstone Repair
-
Asphalting
-
Excavation
-
Rendering
-
Geotechnical testing and reporting
-
Mechanical and Electrical
​
SONA YOGA STUDIO, RANDWICK, – BUILDING & FITOUT WORKS
Client: Private Owner
Hibernian Contracting were engaged by the owner of “Sona Yoga” to undertake the construction & fit out works to transform the space into a beautiful new Yoga Studio and office.
The scope of works included:
-
Demolition
-
Joinery
-
Flooring
-
Air Con
-
Mech & Elec
-
Glazing, Doors and Windows
-
Painting
-
Signage
​
BUILDING & FITOUT WORKS TO LIVE SUBSTATION
Client: Local Government
​
Hibernian Contracting were engaged by local government to undertake the delicate works to an existing heritage substation building.
The scope of works included:
​
-
Protection of live electrical substation equipment
-
Demolition
-
Excavation
-
Concrete
-
Formwork
-
Flooring
-
Walls
-
Roof Replacement
-
External Works
-
Mech & Elec
-
Glazing, Doors and Windows
-
Painting
Bondi Beach - Stormwater Works
​
Client: Local Council
Scope:
Hibernian were engaged as the Principal Contractor for these works and were responsible for engaging all necessary subcontractors and consultants to meet the scope of works involved.
Background Information
The North Bondi Stormwater Culvert, located in North Bondi Beach, runs underneath the length of the promenade, acting as the discharge point for the stormwater system. Noting that there were major visible cracks along the wall and surface of the promenade, it prompted Council to investigate further.
The structural integrity was deemed to be nearing the end of its design life. As such, vehicular movement had been prohibited along the promenade, which caused multiple operational issues.
Council decided to include an the upgrade of the accessible ramp, new pool pump to service to Children’s Pool and incorporate a section of Council’s Lighting and Electrical Masterplan into this project also.
Scope of works involved:
-
Shoring of Biddigal Reserve
-
Coffer dam construction and dewatering
-
Demolition of existing culvert & promenade
-
Construction of an accessible ramp to the kids pool and beach
-
New Pump House
-
Removal of old Ausgrid street lights and poles, installation of new Smart Light poles.
-
Dilapidation report of private properties
-
Electrical upgrade works, including but not limited to, upgrade of existing electrical main switchboard, new pool pump that services the Children’s Pool, handrail and balustrade lighting.
-
Coordination with different parties and authorities for the works, including but not limited to, service authorities, such as Sydney Water, department of heritage and Council
-
Supply, salvage and install of all relevant hardscape and softscape, including but not limited to, benches, beach showers, handrails, pole top lighting.
-
Heritage Works: Careful removal, labelling and storage of old ceramic art-work.
-
Art Work
​
Click on the camera to view some cool footage
Bondi to Coogee Walk. Landslip remediation works, reinstatement of walk and landscaping
​
Client: Local Council
Scope:
- Bulk Earthworks
- Coastal Rock Armoring
- Rock Sawing
- Seawall Construction
- Stormwater Culverts, Drainage, Pipes, Pits & Tanks
- Slope Stabilisation
- Board Walk Works
- Viewing Platform
- Landscaping
- Dam Construction & Waterproofing for Rain garden and hanging swamp. ​
​
Click on the camera to view some cool footage
Decommissioning of over 200 oil tanks
Client: Ausgrid
Scope:
Decommissioned and removed over 200 oil tanks and associated gauge pits/vaults in the Sydney Metro Network area. This project was classified as a “Sensitive Project” due to the potential environmental hazards to the
community. The general scope of work for this Contract included excavation, removal and disposal of oil tanks with the lowest community and environmental impact.
The work under this Contract included:
-
Implementation of traffic control
-
Saw cut
-
Mechanical excavation of roadway surface materials
-
Vacuum excavation of sand around tanks to depths of up to 3.5m
-
Disconnection of oil lines from tank, lifting out of buried oil tanks including encapsulating concrete tubes weighing up to 3 tonnes each
-
Removal of gauge pit/vault lids (including surround) and backfill of pits/vaults once cables have been purged (purging of cables was completed by Ausgrid)
-
Transport and disposal of tanks and pit lids in accordance to safety and environmental controls and legislation (tanks contained residual oil)
-
Placement of backfill material
-
Civil construction.
-
Geotechnical testing of backfill material
​
Road Works & Civil Works - Willoughby Section
Client: Local Council
​
Scope:
- Services Search, Identification and protection.
- Traffic & Pedestrian Management, Road Closures, Diversions
- Excavations of concrete road & disposal
- Asphalting
- Line Marking
- Signage
- Traffic Calming, Speed Humps & Ramps
- Traffic Islands
- Drainage, Pits & Grates,
- Traffic Signals
Holsworthy Army Barrack – Units Relocation
Client: John Holland & Laing O Rourke
​​
Scope:
- Formwork, Reinforcement, Concrete Works
- Sewer Pits & Tanks
- Stormwater Pits & Tanks
- Kerb & Gutter
- Dish Drains
- Footpaths
- Scour Pads
- Culverts
- Tanks
- Plant & Labour Hire
Inner West Light Rail Upgrade
Client: Local Council
Scope: F
- Formwork, Reinforcement, Concrete Works
- Detailed Excavation for Footings on train platforms
- Relocating CCTV poles & Equipment
- Removal & installation of street furniture
- Electrical works
- Tiling, paving, & Tactiles
- Landscaping
- Electrical works
- Removal & installation of ticket machines
- Wayfinding & Signage
- Demolition & re-construction of compliant accessways.
Greensquare – City of Sydney Works
Client: Local Council
Scope:
- Formwork, Reinforcement, Concrete Works
- Excavations & Foundations
- Class 1 Concrete Walls
- Concrete Stairs Construction
- Bluestone kerbing
- Drainage pits, pipes, tanks, connections.
- Supply & installation of street furniture, bus shelters.
- Electrical Infrastructure, smart poles
Griffith & Yanco High Voltage Live Transgrid Substations
Client: UGL
Scope:
- Excavation, Formwork, Reinforcement
- Cable trenches
- Transformer compounds
- Drainage & stormwater works
- Oil tanks Bund Construction
CASTLE HILL CEMETERY UPGRADE WORKS
Client: Local Council
Hibernian Contracting were engaged by local council to undertake the upgrade works at Castle Hill Cemetery.
​
The scope of works included:
-
ï‚· Memorial Garden - Columbarium walls and Pavilion
-
Community Vault, Internment Walls
-
Site office
-
Cemetery Entry – Entry wall, automated gates, boundary fence and signs
-
Main Drive - Road realignment, kerb, footpath, drainage and angle parking
-
Northern Carpark
-
Concrete Pathway Trail in Conservation Area.
​
BUILDING REFURBISHMENT TO AUSGRID SUBSTATION
Client: Ausgrid
​​
Hibernian Contracting were engaged by Ausgrid to undertake the delicate works to an existing heritage substation building.
The scope of works included:
​​
-
Protection of live electrical substation equipment
-
Demolition
-
Roof Replacement
-
Concrete
-
Structural Works
-
Flooring
-
Internal & External Walls
-
External Works
-
Mech & Elec
-
Doors and Windows
-
Painting